Cumulative lead time represents the longest path in the bill of materials, including raw material purchasing and manufacturing lead time. It is established by reviewing the lead time for each bill of material path below the item; whichever path adds up to the greatest number defines the cumulative lead time.

Call us now:


+61 (2) 987-05555