The multi-level Trial Kitting program, is designed to check supply and demand only for materials in the Bills of Materials. It will establish which jobs need to be raised through several levels of a structure as well as the purchasing requirements required to complete the build. All sub-assemblies and components are processed, multiplying the quantity per by the net requirement of the parent. This is then compared to the net quantities on hand to determine the shortage.

Call us now:

Asia-Pacific

+61 (2) 987-05555