Within the Engineering Change Control (ECC) module, engineering change orders (ECO) function as the central mechanism around which changes to your bills of material are controlled and tracked, and status-related events are triggered.

The Engineering Change Order process is a workflow type subsystem. If a product is under the control of ECC, then any maintenance to a bill of material and/or routing of the product can be accomplished only by means of a current ECO.

Engineering Change Orders provides the mechanism to:

  • assign product design tasks to particular users (or groups of users)
  • transfer tasks between users (or groups of users)
  • notify users of new tasks
  • remind users of outstanding tasks
  • sign off engineering changes electronically
Call us now:

Asia-Pacific

+61 (2) 987-05555