When a Bill of material is changed and accepted, using the engineering change control facility, the previous revision/release of the bill can be archived automatically or manually, using the standard SYSPRO archiving facility. This archived bill can be accessed at any stage using the Structure and Routine program

Call us now:

Asia-Pacific

+61 (2) 987-05555